国产92成人精品视频免费,成全动漫在线观看剧情,狸猫换太子电视剧,四川少bbb搡bbb爽爽爽

Welcome to Changzhou painuo Electronic Co. ltd.!
contact
  • General manager: Mr.Wang
  • Phone: +86-13382882032
  • Tel: +86-519-83331905
  • Fax: +86-519-89185073
  • Web: qyjmsdc.com
  • E-mail: wkfpainuo@163.com
  • Add: No.15, Xinhu Road, Xueyan Town, Wujin District, Changzhou City
problem
Position:Home > problem >

Processing and solarPhotovoltaic solar energy laying cable p

(1) A metal cable pipe should not have perforations, cracks, severe corrosion significantly uneven and so on, the pipe wall should be smooth and without glitches. After the cable pipe bending should not have cracks or significantly dented phenomenon, the degree of bend pipe diameter of not more than 10%, the nozzle should be made of horn or polished.
(2) The cable tube diameter of not less than 1.5 times the cable diameter, bend radius should be consistent with the provisions of penetration of cable bend radius. Each cable should not be more than three pipe elbow. Not more than two right angles.
(3) Connecting cable pipe shall meet the following requirements:
a, metal pipes should adopt large short tube socket level, short tube weld ends sealed with a threaded connection time, the connection sealed.
b, metal pipe at the socket or plug, the insertion depth of not less than 1.1 to 1.8 times the diameter, the docking surfaces should be coated with glue cement seal. When using sockets, casing welding ends should be sealed in order to ensure a secure seal.
c, thin-walled steel welded connection is strictly prohibited.
(4) When the thin-walled steel pipe for the cable should be coated with anti-corrosion paint (inside concrete buried pipe may not be painted); When using galvanized pipes, galvanized layer is peeled position should also be coated with anti-corrosion paint.
(5) Lead to the cable pipe outlet location devices should be easy device connection and without prejudice to dismantling and access. Parallel cable laying pipe mouth should be arranged in neat rows.
(6) The protective tube for the grounding wire when use of the cable, the ground wire should be welded well, then the laying of cables. There are threaded pipe joints, should be soldered jumpers.
(7) Pipe into the box (box) To straight, in box (box) within the exposed length equal to or less than 5 mm, with locking nut of the tube, the tube is exposed thread locknut 2 to 4 buckles .

Preparation and installation of cable tray:
(1) Cable tray and accessories should be properly stored and custody, should not cause deformation and damage, and should be product certification.
(2) Cable trays should be installed firmly, smooth vertical and horizontal, the vertical deviation should not be greater than the length of 2/1000, the level of error should not be larger than the width of 2/1000.
(3) Cable bridge in the live production of non-standard parts and welding, must be painted anticorrosive primer, paint should be uniform and complete color consistency.
Prev:None     Next:None
成人漫画免费韩漫无羞遮| 本大道无码人妻精品专区| 人成在线免费视频| 精品国产一级二级三级在线| 大屁股少妇一区二区三区| 男人爱看的网站| 波多野av日韩一区二区| 国产亚洲综合欧美在线热| 成人午夜视频精品一区| 99久久精品费精品国产| 日韩乱码人妻无码系列中文字幕| 狠狠躁天天躁夜夜躁婷婷| 欧美日韩蜜臀精品综合网| 成人黄色av一区二区三区| 国产成人AV无码专区亚| 波多野结衣一区二区三区av高清| 亚洲精品综合久久国产二区| 搡老熟女老女人一区二区| 免费视频免费在线观看等| 日本少妇ⅹxxxxx视频| 一二三四日本中文在线| 40分钟的插曲视频在线观看| 亚洲欧洲中文字幕日韩天堂| 国产免费午夜福利757| 亚洲色婷婷综合| 国产重口老太和小伙a片| 国产在线污黄片免费观看| 黑人荫道bbwbbb大荫道| 成av一区二区三区久久| 日韩综合亚洲色在线影院| 久久精品人人做人人爽欧美| 久热香蕉AV在线爽青青| 狠狠干老司机| 2023国产精品一区二区| 国产精品一区二区av麻豆| 尹人av| 公交车被脱了内裤进入小说| 三级4级全黄60分钟电影| 亚洲夜夜欢AV一区二区| 成年丰满熟妇午夜免费视频| 久久精品国产亚洲av无码偷窥|